Computer network production management system case
Production and operation management system
It is possible to do the production and operation management simply in connecting an operation meter and a carrying notebook personal computer and forwarding collected data.
The effect of the production and operation management system introduction
The first step of the productivity improvement is in the grasping with the correct present situation.
The correct data can be acquired without making an effort of the worker if being a production and operation management system.
Present situation
- The scene situation is ambiguous.
- The ambiguousness because the daily report is handwriting
- It doesn't understand a stop factor.
- It doesn't understand the individual production beginning of the product, ending of time at all.
After introduction
- It grasps the scene situation correctly.
- The daily report is correct at the automatic amount.
- The stop factor is correct.
- It is possible to catch one product, one production beginning, piece of ending time correctly.
1.The way of wiring
The manufacture machine ( The cut receptacle, the robot press machine and the welding machine and so on )

The number of the operation meter socket is the arrangement which was seen from the reverse.
2.The explanation of the operation meter screen
It is the screen example which is collecting manufacture data.
- Time :
- It displays the present time.
- Name of an article :
- It chooses the product name to manufacture from now from the inside of the beforehand registered name of an article with the cursor key.
- Worker :
- It chooses the name of the worker from the inside of the beforehand registered worker name with the cursor key.
- Number of the article of good quality production :
- In the case of the ending of the work on the 1st and also when the present manufacture work is ended, the worker inputs the number of the articles of good quality from the figure key.
- Bad number of the occurrence :
- In the case of the ending of the work on the 1st and also when the present manufacture work is ended, the worker inputs the number of the defective products from the figure key.
- Number of the operation :
- It shows the number of times with worked machine.
In case of the press machine, one increases every time it presses once.
( While the machine starts, the figure displays in the turning-over.)
- Stop factor :
- It displays the contents that a stop factor switch was pushed.
( In input request of stop factor switch, it displays in the turning-over.)
3.The characteristic of the operation meter
It is possible to correspond to the various manufacture machine in replacing a switch sheet in the pasting and setting.
4.The information which is useful for the operation management
(1) The operation graph
The advanced condition of the production can be confirmed every time.
(2) The operation situation confirmation
The details of the operation situation on the 1st can be confirmed.
(3)Stop factor palate figure
The cause which is lowering operation percentage can be confirmed with stone.
To the Japanese home page
To the English home page
E-mail:nc@ncsys.co.jp
NC Co.,Ltd.
President: Motoji Nakajima
1909, TAKATSUKACHO, MINAMI KU, HAMAMATSU SHI, SHIZUOKA KEN, JAPAN 432-8065
TEL 81-53-449-0159
FAX 81-53-448-9165